
Concrete
at its best
Skatepark manufacturer and design office based in Stuttgart. We turn asphalt surfaces into places for sport and movement. Modular, vandal-resistant, long-lasting.
Concrete skate elements since 1998
The first modular skate elements are made.
TÜV certificate and GS mark for tested safety.
Development, manufacturing and logistics are run from Stuttgart.
Tested skate elements
Our first modular skate elements were made in 1998. In 2000 they received the TÜV certificate and the GS mark for tested safety. Today they are tested to EN 14974 (“Skateparks: Safety requirements and test methods”), to PPP 63126B and to further standards. The certificate number is Z1A 056616 0012. That probably made us the first manufacturer in the world of modular concrete skate elements with a TÜV seal. 27 trade articles report on parks built with our system. More than 350 parks have now been built with it.


Our philosophy
Our elements are built to last, need little maintenance and can later be moved, rearranged or recycled. The modules can be combined almost freely.
We manufacture at the factory under controlled conditions and build on site in a few days.
The elements are made at the factory in laser-cut steel formwork, not as in-situ concrete on the building site. Reinforcement, wall thickness and shape can therefore be checked whatever the weather. Our edge protection profiles, introduced in the 1990s, are cast into every rideable edge. The first elements are still in use in public spaces after 25 years and have not needed refurbishment.
The same manufacturing approach is behind our hockey boards, pump track modules, changing cubicles, barbecue areas and shelters: solid, foundation-free and low-maintenance.
Sustainable
Concrete and steel are largely recyclable.
Precise
Factory manufacture accurate to the millimetre
How we work

Design
For skateparks, we design your park in 3D, adapt the layout to your site and set it out on the ground.

Manufacture
The elements are made of reinforced concrete C35/45. Wall thickness, reinforcement and joints are checked at the factory, whatever the weather. TÜV monitors production regularly.

Transport
Unloading is done with a forklift or mobile crane. The hollow construction saves weight. The load is secured according to the product.

Installation
The elements are set up in a few days and need no ground fixings. The park can be extended at any time with further modules.
From lorry to finished park
We install our skate elements either with transition plates directly on a concrete or asphalt riding surface, or on a foundation slab, with concrete then cast up against them. We provide installation and maintenance instructions.


A+ in the trade press

Friedrichsdorf Skatepark

“Schnecke” changing and shower cubicle

Berlin-Reinickendorf pump track
“Architecture does not stop at the edge of the building. The space in between, where life happens, deserves the same quality and attention.”
Dipl.-Ing. Cüneyit Akcakoca
Architect · A+ Urban Design
To date, A+ Urban Design has built more than 350 skateparks across Europe: from the Canary Islands to Norway and from Great Britain to Turkey. We have run development, manufacturing and logistics from Stuttgart since 2025.
post@aplusurbandesign.comOur
Catalogue
Our catalogue lists every element with dimensions, example combinations and notes on standards, plus the installation and maintenance instructions.
Request the cataloguearrow_forwardOne click opens your email app with a prepared message. We send the catalogue to you personally.
