
No foundations
Stands on existing asphalt or concrete. No concreting on site.
















Stands on existing asphalt or concrete. No concreting on site.

Wooden ramps wear out and splinter, steel ramps dent and their bolts work loose: our concrete stands up to all of it.

TÜV-certified since 2000. TÜV also monitors production.

No demolition, no rubble. Your investment moves with you.
We guide you from the first idea to the detailed design to EN 14974. Based on your site and budget, we produce plan views and 3D designs.

Faster, usually cheaper and less weather-dependent than in-situ concrete: our modular precast units are installed directly on asphalt, concrete or a foundation slab. Our team typically completes a turnkey park in a few days.

Even after opening, the park can be extended, rearranged or moved. Individual modules can be repaired. We supply maintenance instructions, support extensions and remain your point of contact.
Our catalogue lists every element with dimensions, example combinations and notes on standards, plus the installation and maintenance instructions.
Request the cataloguearrow_forwardOne click opens your email app with a prepared message. We send the catalogue to you personally.

Everything about planning, costs, funding and construction of skateparks, pump tracks and BMX facilities, from your skatepark manufacturer.
The cost of a skatepark or pump track depends on size, the choice of elements and the ground. In many projects, modular precast concrete is cheaper than in-situ concrete, because earthworks, base slabs and extensive preparation are largely unnecessary. Our price list includes example parks with costs, which we are happy to send you. We offer a free, no-obligation initial consultation with a cost estimate for your project.
In practice these terms mean the same thing: an area with obstacles such as ramps, bowls, rails and pipes for skateboards, BMX, scooters and inline skates. “Skatepark” is the usual word, and a “skate plaza” usually means a street-style layout. We build all of these from modular precast concrete.
Yes. The concrete surfaces withstand the point loads of BMX pegs and scooter decks for years. Unsealed concrete stays grippy even when wet, for skateboards, BMX, scooters and inline skates. All parks are designed for several sports.
Concrete holds its shape, needs little maintenance and resists vandalism, even in frost and heat. Our skate ramps and pump track elements in reinforced C35/45 concrete last much longer than timber ramps. On top of that comes the modular system: elements can be rearranged, removed or added to without breaking up foundations.
In Germany, yes. Municipalities can apply for funds from the federal and state sports facility programmes. Programmes for urban open space and physical activity may also apply. We support you with the funding application and the tender, and supply the technical documents you need, from the EN 14974 TÜV certificate to the structural calculations.
In our experience, concrete elements are around 5–8 dB(A) quieter than ramps made of timber, metal or plastic. That can make planning permission easier. During the approval process we support you with structural calculations and the necessary supporting documents.
Yes, that is exactly what the A+ modular system is for. Many municipalities start with a starter kit, for example a quarter pipe, a bank and a rail, and extend the skatepark over the years. Because no foundations are poured, this is possible at any time. Elements can also be rearranged or moved to a new site.
The process starts with a needs analysis on site. We take care of the entire planning: from the design through 3D planning and detailed engineering to EN 14974, to turnkey installation. The precast concrete units arrive by lorry and are set up with a forklift, a pallet truck or, for pipes and tall elements, a mobile crane. A typical skatepark is in place within a few days.
We use cookies and similar technologies to improve our website and make it work as well as possible for you.
Legal notice•Privacy