
Berlin-Reinickendorf Pump Track
Project
The first pump track in the Reinickendorf district, next to the Humboldt-Gymnasium, built with modular TÜV-certified concrete elements from A+ Urban Design. The track runs partly over the Tegel Tunnel and had to be routed between existing trees.
The first pump track in Berlin's Reinickendorf district was built next to the Humboldt-Gymnasium. It runs partly over the Tegel Tunnel and had to be routed through existing trees, which called for careful route planning in a tight space.
It was built from modular concrete pump track elements: banked turns and straight sections with obstacles, where riders pick up speed by shifting their weight alone, without pedalling. A+ Urban Design supplied specially developed, low-maintenance concrete elements and supported the route planning.
Sources (in German): kommunaldirekt.de ("Pump-Track in Berlin", 2022), freiraum-gestalten.info ("Pumptracken in Berlin", FREIRAUM GESTALTEN 05/2022).
Project data
- Type
- Pump track
- Material
- Concrete C35/45
Systems used
Images




A similar project?
Planning a similar project? We support you from the first sketch to completion.
Enquire about your project